本文二维码信息
二维码(扫一下试试看!)
Analysis and Countermeasure of Measurement Error of Drum Water Level of High-pressure Alkali Recovery Boiler
  
DOI:10.11980/j.issn.0254-508X.2013.09.009
Key Words:alkali recovery boiler  drum water level  measurement error  compensation  balance container
Author NameAffiliation
牛 帅 中国中轻国际工程有限公司,北京,100026 
Hits: 4322
Download times: 1291
Abstract:Selection of measurement methods, implementation of compensation steps and proper installation are three main aspects for realizing accurate drum water level measurement. Based on this idea, this article puts forward the countermeasures for decreasing the measurement error by analyzing the cause of drum water level measurement error of high-pressure alkali recovery boiler based on a project case.
View Full Text  HTML  View/Add Comment  Download reader