本文二维码信息
二维码(扫一下试试看!)
QCS Rebuilding of the Modern Board Machine
  
DOI:10.11980/j.issn.0254-508X.2012.06.012
Key Words:QCS  upgrade rebuilding  commissioning time
Author NameAffiliation
林 征 宁波中华纸业有限公司浙江宁波315012 
吴晓彤 宁波中华纸业有限公司浙江宁波315012 
Hits: 4813
Download times: 1219
Abstract:Paper machines which have been put into operation for more than 10 years are facing the issue of QCS update rebuilding, the article elaborated how to shorten the rebuilding time from the aspects of technical negotiation, liaison of system design, installation preparation, system installation and QCS start up and commissioning.
View Full Text  HTML  View/Add Comment  Download reader