|
 二维码(扫一下试试看!) |
| Key Difficulties and Implementation Solutions for Designing Domestic High-temperature and High-pressure Alkali Recovery Boilers |
| Received:February 02, 2026 Revised:March 03, 2026 |
| DOI:10.11980/j.issn.0254-508X.2026.07.022 |
| Key Words:alkali recovery boiler metal corrosion high-temperature and high-pressure |
| Author Name | Affiliation | Postcode | | Shi Jianbo* | 1Wuhan Boiler Energy Engineering Co., Ltd., Wuhan, Hubei Province, 430200 | 430200 | | Wang Yidan* | 1Wuhan Boiler Energy Engineering Co., Ltd., Wuhan, Hubei Province, 430200 | 430200 | | Tang Hua | 2Yunnan Yunjing Forest Paper Co., Ltd., Pu’er, Yunnan Province, 666499 | 666499 | | Wang Dawei | 1Wuhan Boiler Energy Engineering Co., Ltd., Wuhan, Hubei Province, 430200 | 430200 |
|
| Hits: 346 |
| Download times: 24 |
| Abstract:This paper presented the current status of high-temperature and high-pressure alkali recovery boilers in China, highlighting three key challenges faced by these boilers: metal corrosion of heating surfaces (e.g., water wall corrosion, superheater corrosion), improving combustion efficiency, and reducing pollutant emissions, along with corresponding mitigation strategies. It also explored potential future directions for the development of alkali recovery boiler technology. |
| View Full Text HTML View/Add Comment Download reader |
|
|
|