QCS Rebuilding of the Modern Board Machine
  
DOI:10.11980/j.issn.0254-508X.2012.06.012
Key Words:QCS  upgrade rebuilding  commissioning time
Author NameAffiliation
林 征 宁波中华纸业有限公司浙江宁波315012 
吴晓彤 宁波中华纸业有限公司浙江宁波315012 
Hits: 5429
Download times: 1547
Abstract:Paper machines which have been put into operation for more than 10 years are facing the issue of QCS update rebuilding, the article elaborated how to shorten the rebuilding time from the aspects of technical negotiation, liaison of system design, installation preparation, system installation and QCS start up and commissioning.