QCS Rebuilding of the Modern Board Machine
  
DOI:10.11980/j.issn.0254-508X.2012.06.012
Key Words:QCS  upgrade rebuilding  commissioning time
Author NameAffiliation
林 征 宁波中华纸业有限公司,浙江宁波,315012 
吴晓彤 宁波中华纸业有限公司,浙江宁波,315012 
Hits: 8969
Download times: 2456
Abstract:Paper machines which have been put into operation for more than 10 years are facing the issue of QCS update rebuilding, the article elaborated how to shorten the rebuilding time from the aspects of technical negotiation, liaison of system design, installation preparation, system installation and QCS start up and commissioning.