Abstract:In this paper, the main factors affecting the forestry-paper integration project were analyzed by means of cost structure analysis (CSA) method and the cost and profit analysis model was established. The existence of an appropriate scale project with the lowest cost and maximum profit is proved theoretically. This thesis provides a theoretical basis for optimizing the size of a forestry-paper integration project.