现代化纸机QCS系统的更新改造 |
QCS Rebuilding of the Modern Board Machine |
收稿日期: |
DOI:10.11980/j.issn.0254-508X.2012.06.012 |
关键词: QCS 系统升级改造 调试 |
Key Words:QCS upgrade rebuilding commissioning time |
基金项目: |
|
摘要点击次数: 5430 |
全文下载次数: 1547 |
摘要:从技术洽谈、设计联络、安装准备、系统安装和调试等方面详细阐述了缩短现代化纸机QCS升级改造时间的经验和方法。 |
Abstract:Paper machines which have been put into operation for more than 10 years are facing the issue of QCS update rebuilding, the article elaborated how to shorten the rebuilding time from the aspects of technical negotiation, liaison of system design, installation preparation, system installation and QCS start up and commissioning. |